Project Progress

1
Construction of a Promenade connecting Cadogan Street and Sai Ning Street
2
Improvement Works at Victoria Road near Mount Davis
3
Improvement Works from Victoria Road to Sha Wan Drive
4
Construction of a Trail along the Rocky Shore at Sandy Bay
5
Construction of a Footbridge connecting the Waterfall Bay Park and Cyberport Road
6
Improvement works to the Waterfall Bay Park
7
Provision of Trail between South Bay Beach and Chung Hom Kok Fresh Water Service Reservoir
8
Beautification Works at the Existing Open Space near Hairpin Beach
9
Provision of Trail connecting Tai Tam Road and Lo Fu Shan Catchwater and Lo Fu Shan Catchwater Improvement Works
10
Trail Provision and Improvement Works near Tai Tam
11
Trail Provision and Improvement Works from Shek O Road to Shek O Beach
12
East Coast Boardwalk